MEMORY GARDEN
 The Memory Garden is a beautiful area located at the front entrance of the park where loved ones, friends and family are recognized and remembered with a brass leaf plaque located on one of the monumental trees. Please call the Parks and Recreation Department 519-633-7112 if you are interested in purchasing a leaf or download the memory leaf application form.
|
Latest News
| Construction Advisory Notice - 2013 Sidewalk Replacement Program |
| 22/05/2013 |
| The City's Contractor will be commencing spot repair of sidewalk bays on the east side of Stanley Street between Victoria Street and Drake Street, on the south side of Drake Street between Isabel Street and Metcalfe Street and on the west and east sides of Metcalfe Street between Prince Albert Street and Centre Street. |
|
| Construction Advisory Notice - 2013 Sidewalk Replacement Program |
| 22/05/2013 |
| The City's Contractor will be commencing spot repair of sidewalk bays on the east side of Margaret Street between Prince Albert Street and Victoria Street, on the south side of Prince Albert Street between Margaret Street and Metcalfe Street and on the north side of St. Annes Place between Queen Street and Metcalfe Street. |
|
| Notice of Temporary Road Closure |
| 22/05/2013 |
| The City's Consultant (Stantec) will be conducting underground investigations on the above section of Sunset Drive on Tuesday, May 28th starting at 9:30 a.m. for approximately a one hour period. |
|
| Public Information Centre Notification |
| 21/05/2013 |
| The City of St. Thomas Environmental Services Department will be holding a Public Information Centre (PIC) for the development of two new parking lots on the north side of Centre Street on the former CASO Railway Lands with 21 and 34 spaces, respectively, and a new angled parking area with 10 spaces on the west side of Metcalfe Street, for the specified project limits. |
|
| Construction Advisory Notice - Talbot Street - Princess Avenue/St. Catharine Street to John Street - Revised Traffic Control/Detour Route commencing Wednesday, May 22, 2013 |
| 17/05/2013 |
| The City's Contractor is continuing construction on the Moore Street and L&PS Train Station/Rail Corridor capital projects. The balance of construction work on Talbot Street, after the road closure for the placement of the first lift of base course asphalt on Tuesday, May 21, 2013, involves the installation of curb/gutter, sidewalk, paving stones, second lift of base course asphalt, surface course pavement layer, and other miscellaneous surface works. |
| | More >> |
Popular Pages
|